A temporary pathway using the Kimball Pines park road is now available, temporary blazing should be in place soon. PREVIOUS POSTING: From: Ron S. – Kimball Pines park near Battle Creek was damaged by high winds on Sunday May 29, 2011. The park is closed until the cleanup is complete. Suggested alternate route from Bridges Park […]
Our Stories
Category: Lower Michigan
Trail Alert: UPDATED from 3/1/2011 Albion, Michigan
[fb-share] The bridge has been rebuilt with a pedestrian walkway and is now open to traffic. PREVIOUS POSTING – From Ron Sootsman – I just ran across a problem. I hiked from Litchfield to Albion today and had my Mom pick me up in Albion. The trouble: the bridge that is on the south side […]